Martin County

File #: 24-1262   
Type: Departmental Quasi Judicial Status: Agenda Ready
In control: Board of County Commissioners
On agenda: 9/10/2024 Final action:
Title: REQUEST PLAT APPROVAL FOR THE 95 RIVERSIDE PLANNED UNIT DEVELOPMENT (PUD) PHASE IV PROJECT (N027-014)
Attachments: 1. 2024_0816_N027-014_Staff_Report_Final.pdf, 2. 2024_0815_N027-014_Plat.pdf, 3. 2024_0819_N027-014_Draft Contract.pdf, 4. 2024_0813_N027-014_Draft Surety.pdf, 5. 2024_0813_N027-014_Approved EOPC .pdf, 6. 2024_0813_N027-014_Survey.pdf, 7. 2024_0910_N027-014_Resolution to Approve Phase IV Revised FSP.pdf, 8. Exhibit A_Legal Description.pdf, 9. Exhibit B_Phase IV Revised Final Site Plan.pdf, 10. 2024_0813_N027-014_Resolution to Release and Terminate Access Easment.pdf, 11. 2024_0813_N027-014_Resolution to Release and Terminate Pedestrian Access Easment.pdf, 12. 2024_0813_N027-014_Application Materials.pdf, 13. 2024_0813_N027-014_Disclosure of Interest Affidavit.pdf, 14. 2024_0813_N027-014_Sign Posting Affidavit.pdf, 15. Staff_Presentation
PLACEMENT: Departmental - Quasi-Judicial
TITLE:
title
REQUEST PLAT APPROVAL FOR THE 95 RIVERSIDE PLANNED UNIT DEVELOPMENT (PUD) PHASE IV PROJECT (N027-014)
end
EXECUTIVE SUMMARY:
executive summary
This is a request by HJA Design Studio, LLC, on behalf of Pulte Home Company, LLC, for approval of the 95 Riverside PUD Phase IV Plat. The plat is to be consistent with the Phase IV Final Site Plan which contains 98 single-family townhomes on an approximately 12.40-acre site. The 95 Riverside PUD is located on the north side of SW Kanner Highway/SR 76, on SW Lost River Road, approximately 0.17 miles east of the I-95 interchange in Stuart. Included is a request for a Certificate of Public Facilities Exemption.
body
DEPARTMENT: Growth Management
PREPARED BY: Name: John Sinnott
Title: Senior Planner
REQUESTED BY: HJA Design Studio, LLC, Todd Troxell

PRESET:
PROCEDURES: Quasi-Judicial

BACKGROUND/RELATED STRATEGIC GOAL:

The 95 Riverside PUD was originally approved as a six (6) phase master plan in 1987 for approximately 201,000 gross square feet of office, retail, gas station and hotel use. The PUD is located at the northeast corner of the I-95 north interchange of SW Kanner Highway with a portion of the PUD on the west side of SW Lost River Road and a portion on the north and east side of SW Lost River Road. Phase IV is located at 7439 SW Lost River Road, on the northwest corner of SW Kanner Highway/SR 76 and SW Lost River Road. A portion of SW Lost River Road was constructed as part of the 95 Riverside PUD. The 95 Riverside PUD today contains a gas station, Cracker Barrel restaurant, hotel, McDonalds with drive-thru, and a vacant welcome center.

The proposed plat is to be consistent with the Phase IV Final Site Plan which contains 98 single-family townhomes on an approximately 12.40-acre site. The Phase IV Final Site was approved on November 7, 2023. As a result of the review of the plat application, minor technical adjustments were required to...

Click here for full text