File #: 26-0507   
Type: Consent Status: Agenda Ready
In control: Board of County Commissioners
On agenda: 2/10/2026 Final action:
Title: INTERLOCAL AGREEMENT FOR THE SOUTH SEWALL'S POINT FORCE MAIN EXTENSION PROJECT PHASE 3
Attachments: 1. 2026_0106 Interlocal Agreement South Sewall's Point Phase 3 - TOSP Executed.pdf
PLACEMENT: Consent
TITLE:
title
INTERLOCAL AGREEMENT FOR THE SOUTH SEWALL'S POINT FORCE MAIN EXTENSION PROJECT PHASE 3
end
EXECUTIVE SUMMARY:
executive summary
The Board of County Commissioners is requested to authorize execution of the Interlocal Agreement between Martin County and the Town of Sewall's Point for the South Sewall's Point Force Main Extension.
body
DEPARTMENT: Utilities and Solid Waste
PREPARED BY: Name: Leo Repetti, P.E.
Title: Technical Services Administrator
REQUESTED BY: Samuel Amerson, P.E., Utilities & Solid Waste Director

PRESET:
PROCEDURES: None

BACKGROUND/RELATED STRATEGIC GOAL:

1. Agreement prepared by:
Martin County (Legal Department)

2. Parties to the Agreement:
Martin County
The Town of Sewall's Point

3. Purpose of the Agreement:
To provide a mechanism for transfer of the infrastructure to Martin County for maintenance and operation once complete.

4. New/Revised Document: New

5. Duration:
Until final completion of the Project and turnover of the infrastructure is complete.

6. Benefits to Martin County:
The wastewater force mains installed as part of the Project will provide service availability to approximately 205 Martin County Residents.

7. Costs to Martin County: $0

The Town of Sewall's Point (Town) has budgeted for the design, permitting and construction, including installation, of small diameter force mains, gravity sewer and a lift station to provide sanitary sewer service to properties within its boundaries, that will connect to the Martin County's utility service (Town Project).

The Town has obtained bids, utilizing a unit price and quantity document and contract for goods and services required for the construction of the Project, and has selected and contracted the Construction Engineering and Inspection (CEI) for the Project.

The Town approved the item on their January 6, 2026 regular Town Commission meeting.