Title: INITIAL ASSESSMENT RESOLUTION FOR THE CORAL GARDENS WASTEWATER MUNICIPAL SERVICE BENEFIT UNIT
Attachments: 1. Coral Gardens - Initial Assessment Resolution - agenda version.pdf
PLACEMENT: Consent
TITLE:
title
INITIAL ASSESSMENT RESOLUTION FOR THE CORAL GARDENS WASTEWATER MUNICIPAL SERVICE BENEFIT UNIT
end
EXECUTIVE SUMMARY:
executive summary
Board action is requested to adopt the initial assessment resolution for the Coral Gardens Wastewater Municipal Service Benefit Unit to allow installation of a vacuum assisted gravity wastewater collection system and associated vacuum pump station.
body
DEPARTMENT: Utilities and Solid Waste
PREPARED BY: Name: Leo Repetti, P.E.
Title: Technical Services Administrator
REQUESTED BY: Samuel Amerson, P.E., Utilities & Solid Waste Director

PRESET:
PROCEDURES: None

BACKGROUND/RELATED STRATEGIC GOAL:

This project entails construction of a vacuum assisted gravity sewer system and associated pumping facility to provide sanitary sewer service to approximately 631 single family residential parcels of land in the Coral Gardens area of Martin County, Florida. The project includes construction of the underground collection system along the road rights of way with valve pits to service the units and construction of a vacuum sewage collection and pumping facility to be located on a Martin County owned parcel of land on Willoughby Blvd.
The project will enhance water quality in the St. Lucie Estuary by eliminating nutrient loading from septic systems at the rate of 3.5 lbs total nitrogen and .89 lbs total phosphorous per month per septic tank as indicated by a Florida Department of Environmental Protection study. In addition, the increased wastewater flow of approximately 157,750 gallons per day at the Tropical Farms Wastewater Treatment Plant will be converted to reuse quality water for irrigation use.
The proposed assessment includes 631 parcels with a total of 631 equivalent residential connections (ERCs). The total project cost estimate is $18,182,526.00, including: $14,086,089.00 for construction, $2,249,156.00 for design, survey and engineering, $1,325,100.00 Capital Facilities Cha...